000 | 01065cam a22002894a 4500 | ||
---|---|---|---|
001 | 12980644 | ||
005 | 20141022131015.0 | ||
008 | 021025s2003 mau b 001 0 eng | ||
010 | _a 2002152784 | ||
020 | _a9788129700513 | ||
040 |
_aDLC _cDLC _dDLC |
||
042 | _apcc | ||
050 | 0 | 0 |
_aQA76.758 _b.C518 2003 |
082 | 0 | 0 |
_a005.106 _221 _bCHR-C |
100 | 1 | _aChrissis, Mary Beth. | |
245 | 1 | 0 |
_aCMMI : _bguidelines for process integration and product improvement _cMary Beth Chrissis, Mike Konrad, Sandy Shrum. |
260 |
_aNew Delhi : _bAddison-Wesley, _c©2003. |
||
300 |
_axx, 663 p. ; _c24 cm. |
||
504 | _aIncludes bibliographical references and index. | ||
650 | 0 | _aCapability maturity model (Computer software) | |
650 | 0 | _aSoftware engineering. | |
700 | 1 | _aKonrad, Mike. | |
700 | 1 | _aShrum, Sandy. | |
906 |
_a7 _bcbc _corignew _d1 _eecip _f20 _gy-gencatlg |
||
942 |
_2ddc _cBK |
||
999 |
_c10296 _d10296 |